Tadoussac in numbers
| Population (2026 decree) | 789 |
| Area | 200.11 km² |
| MRC | La Haute-Côte-Nord |
| Region | Côte-Nord |
| Incorporated | 1899 |
| Planning and zoning | Official page |
| Building permits | Official page |
| Planning bylaws | Official page |
| Council minutes | Official page |
| Municipal website | www.municipalite.tadoussac.com |
In brief: Tadoussac housing now runs through 24 affordable units planned in the portfolio of the Société de développement de l'Est (SDE), with target rents of $600 to $800 a month and delivery expected by 2027. The mayor calls the situation "crazy" and says six units during his term would already count as a win. Council has already paid for a site study on the housing office's land, an engineering review of water capacity and a grant application for a housing project manager. A modular project in Tadoussac will turn on land, water, heritage zoning and the Saguenay ferry.
Tadoussac housing comes down to a simple tension. The village lives on tourism, draws thousands of visitors every year and has about 800 residents. Its workers, young families and seniors compete for a housing stock that has grown very little in twenty years. In 2026 the municipality stopped waiting for a developer and organised itself to receive a project.
Tadoussac sits in the La Haute-Côte-Nord RCM, in the Côte-Nord administrative region. Its neighbours, Les Bergeronnes among them, also have a housing office of 11 units. For the general framework, the affordable housing guide for small municipalities and the article on PHAQ stream 3 explained for councils give the reference points.
Tadoussac in numbers: what the data says
The Quebec municipal directory lists 789 residents in Tadoussac. The 2021 census counts 814, up from 799 in 2016, an increase of 1.9%. The municipal profile uses the figure of 814 and dates the village's incorporation to November 1899.
514 dwellings, 117 without usual residents
The census counts 514 dwellings, of which 397 are occupied by usual residents. The other 117 are not: they are second homes, seasonal dwellings or vacant units, and the profile does not split them. In a tourist village that gap matters for the market. It partly explains why a resident described, in 2025, clients ready to settle who can no longer find houses.
The stock is old. According to the census, 105 dwellings date from before 1961 (26.6%), 95 from 1961 to 1980 and 55 from 1981 to 1990. The 1990s add 90. Between 2001 and 2005 none were built. From 2006 to 2021 construction totals 50 dwellings: 10, 15 and then 25 per five-year period. The village grew by 15 people between 2016 and 2021 and added 25 dwellings, which says nothing about how they are used.
Few renters, many owners
Tadoussac has 270 owner households and 130 renter households (32.9%). Median monthly rent is $600 and median owner shelter cost is $770. Median dwelling value is $190,000 in the 2021 census. No renter household spends 30% or more of income on shelter in this profile, and 8.9% of all households (35 households) do. These figures describe 2021 and an installed base of tenants. They do not say what a newcomer pays in 2026.
An older population
Median age is 51.2 and 27.2% of residents are 65 or older. Average household size is two. Core housing need affects 7.6% of households. Major repairs concern 40 dwellings, or 10.1% of the stock. A population of that age raises two housing questions: seniors who might free up their houses, and families with nowhere to land.
What is happening in Tadoussac housing
Most of the facts are recent. They involve a regional portfolio, a nonprofit partner, a site study on the housing office's land, a water-network mandate and a council that refuses to turn residential buildings into businesses.
A 24-unit portfolio with the SDE
On 17 July 2026 the minister responsible for housing announced, in Métis-sur-Mer, about 400 affordable units in 15 municipalities of the Gaspésie, Bas-Saint-Laurent and Côte-Nord. Radio-Canada reports that Tadoussac will receive 24 of them, as Matane gets 36 and Rimouski 32. Planned rents are between $600 and $800 a month. Units will be mostly 4 ½, with some 3 ½ and 5 ½. The SDE is betting on a prefabricated, modular six-unit building model, and deliveries are expected by 2027.
What the municipality contributes
The municipalities' share will largely be tax holidays and land donations, according to the same article. La Presse adds on 22 August 2026 that each municipality gives land free and a property tax holiday of 20 to 30 years to the SDE. The organisation won a contract for 478 units in 17 municipalities, at about $313,000 per unit, while the average cost of Quebec-backed construction reached nearly $600,000 last year in the Gaspésie. The article 478 modular housing units for 17 municipalities details the contract. Manufacturing goes to the manufacturers selected by the SDE.
Why the model suits a village of 800
The SDE's CEO sums up the problem: a small municipality that lacks six, eight or twelve units is in a crisis as real as Montreal's, without purchasing power or bargaining power. Pooling projects lets Quebec, Ottawa and the municipalities fund them together. The guide on pooling municipalities into a housing portfolio explains the mechanics.
A mayor aiming for six units
Mayor Claude Brassard is quoted by Radio-Canada on 4 September 2026: "Housing in Tadoussac, it's crazy. If we could have just six units during our term, it would already be a win." The context is a solidarity cooperative born from an attempt to buy the Auberge La Galouïne. It has about fifty members, and its long-term goal is to become a local development company, including on accommodation. The municipality stays neutral on the purchase of the inn but sees housing as the most promising area of collaboration.
Testimonies describe concrete problems: housing for workers, but also for young families whose children cannot settle in the village.
A strategic plan through 2029
On 21 October 2026, Le Haute Côte-Nord reports that Tadoussac will consult residents on its priorities through 2029. The mayor names three themes: diversifying revenue, housing and upkeep of municipal buildings. He says the link with the SDE "will let us move faster" if a housing project comes up. The consultation could take place in early 2027, after the budget. Regular council meetings usually draw about thirty people.
What council voted in 2026
The minutes show a step-by-step approach.
13 January: a lot for sale and two refusals
Council authorised the sale by call for tenders of lot 4 342 594, a property acquired for demolition, to recover the $35,980 acquisition cost. The outcome of the call does not appear in the minutes published as of 21 October 2026. The same day it refused to move 247 rue des Forgerons (a guesthouse) from zone 24-H to zone 21-CH for a souvenir shop, citing housing and road safety. It also refused a specific project (PPCMOI) for 176 rue du Bord-de-l'Eau, where a potential buyer wanted a tourist accommodation and commercial project in a zone that does not allow it, following the planning advisory committee's recommendation and citing the building's heritage character.
10 March: a site study on the housing office's land
Council accepted a service offer dated 3 November 2025 from an architecture firm, for $6,850 before tax, to study housing placement on the land of the Office municipal d'habitation de Tadoussac. The resolution notes that demand for social housing is rising and that this land is one of the solutions in the affordable housing development plan. In December 2025, a study on expanding the housing office had been postponed.
9 June: water capacity and a project manager
Council gave an engineer a mandate to assess the capacity of the water networks for housing projects: a bank of 15 hours at $125 an hour. It authorised two grant applications for a project called "Chargé de projet en logement" (housing project manager): $58,500 to the RCM's Alliance pour la solidarité program and $50,000 to the RCM's Fonds régions et ruralité. The resolution states that council intends to equip the municipality with housing inside its urbanised territory.
15 June: support for a nonprofit
At an extraordinary meeting, council adopted resolution 2026-06-248 to support the affordable housing projects of the Société du Patrimoine de l'Est, a nonprofit. The municipality commits to identify lots, facilitate their acquisition, contribute financially and adapt its bylaws, including through a PPCMOI and the powers in section 93 of the 2024 Bill 31. The resolution says this nonprofit already works with the Manicouagan RCM and that talks are under way with other Haute-Côte-Nord partners.
14 July: zoning update
Council hired an urban planning firm ($2,400 before tax) to align the zoning plan with the new land-use boundaries and to integrate the framework for landslide-prone zones and shoreline erosion (bylaw no. 169-2025). Any project will have to account for this revision.
The shortage since 2022
In April 2022 residents packed the council room. They objected to contractors buying apartments and houses to re-rent them to seasonal workers who occupy them only a few months. Radio-Canada then quoted the mayor of the day, Richard Therrien: houses under $200,000 no longer exist in Tadoussac. Council had adopted a resolution to put three lots on rue Des Bouleaux up for sale.
In April 2025, the same outlet described families, seniors, foreign workers and seasonal workers struggling to find housing. The municipality had a housing committee and was looking for land. Its mayor found it hard to attract developers to a village of 800. In 2026 the mayor is Claude Brassard, and the municipality works through mandates, resolutions and a partner.
A fragile regional context
The La Haute-Côte-Nord RCM ranks 102nd of 104 on the economic vitality index, according to a portrait Radio-Canada reported in October 2025. One resident in three is over 65 and the economy rests on seasonal work: fishing, forestry, tourism. Housing issues are described as newer than the others. A collective of about fifty partners is working on a roadmap.
A tourist tax under consideration
In February 2026 the mayor floated a tourist tax to diversify revenue, because residents are "taxed to the maximum." Radio-Canada reports that Tadoussac would also like special status with Quebec. The link to housing is indirect: a municipality of 800 that pays for thousands of visitors has little room to contribute to a project.
Housing organisations in Tadoussac and the RCM
The SHQ directory of housing organisations lists one organisation in Tadoussac: the Office municipal d'habitation de Tadoussac, which runs 11 subsidised units, all HLM for seniors. The office's 2026 budget shows a $71,007 deficit, which council approved on 13 January 2026. On 9 June it approved a revised budget filed by the SHQ on 1 May, which moves the municipality's share from $2,925 to $3,149.
Council treats the office as the starting point for an expansion: the 2026 study targets the OMH's own land.
Elsewhere in the RCM, the directory lists:
- Office municipal d'habitation de Colombier (Colombier): 18 subsidised units, 15 HLM and 3 rent supplements (PSL), for seniors and single people.
- Office municipal d'habitation de Forestville (Forestville): 67 subsidised units, 36 HLM and 31 PSL.
- Office municipal d'habitation de Sainte-Anne-de-Portneuf (Portneuf-sur-Mer): 23 subsidised units, 21 HLM and 2 PSL.
- Office municipal d'habitation de Les Escoumins (Les Escoumins): 12 subsidised units, 10 HLM and 2 PSL.
- Office municipal d'habitation de Bergeronnes (Les Bergeronnes): 11 HLM units for seniors.
- Office municipal d'habitation de Sacré-Coeur (Sacré-Coeur): 29 subsidised units, 28 HLM and 1 PSL.
- Villa Forestville (nonprofit, Forestville): 17 subsidised units for seniors, 8 HLM and 9 PSL.
- Logis Escouminois (Les) (nonprofit, Les Escoumins): 4 PSL units for seniors.
- Pignons populaires du Sacré-Coeur Inc. (les) (nonprofit, Sacré-Coeur): 7 PSL units for seniors.
In Sacré-Coeur, the housing office director said in April 2025 that she had twelve applications waiting for 27 units, all occupied.
What a municipality the size of Tadoussac can do
Tadoussac has already set several levers in motion. Here is what remains to settle, with the points that matter at this size.
Offer land and a tax holiday
This is the contribution the SDE expects: free land and a tax holiday of 20 to 30 years. The guide on transferring municipal land to a nonprofit describes the forms it can take. In Tadoussac, the OMH land is the subject of a site study, and council committed on 15 June 2026 to identify other potential lots. Lot 4 342 594, put up for sale to recover $35,980, shows the municipality also holds land it wants to dispose of.
Prepare the bylaws before the permit application
Council has committed to amending its bylaws (zoning, PPCMOI) for a nonprofit. The planning bylaws already require a site planning and architectural integration plan (PIIA) for new construction in several village zones, with review by the planning advisory committee. The municipal page warns applicants to allow extra time. The article on municipal rules that block housing helps spot what slows projects down.
Fund the project manager
A 24-unit project exceeds the capacity of an administration serving 800 residents. The two grant applications for a project manager ($58,500 and $50,000, outcome not published) address that gap.
Connect the project to programs
The municipal contribution is calculated within the PHAQ. The article on the municipal PHAQ contribution gives the method and examples, and funding an affordable modular housing project covers the other sources. For seniors, the guide to a modular seniors' residence compares the formulas.
Keep existing housing
Demolition bylaw no. 396 (required since the 2023 heritage law) aims, among other things, to preserve housing in a shortage. It protects buildings of interest from before 1940 and goes through a three-member committee of councillors. The 13 January refusal to turn a guesthouse into a shop points the same way. The aid programs page still relays RénoRégion, a program Les Bergeronnes asked the government to relaunch in April 2025 after its announced abolition: check with the Municipality before counting on it. It also relays the heritage renovation advice service, which the RCM funds at 90% for residences.
Building modular up to Tadoussac
Tadoussac's logistics run through a ferry: the Société des traversiers du Québec (STQ) operates the Tadoussac-Baie-Sainte-Catherine crossing, whose schedule depends on available crew. That constraint matters for module deliveries and for recruiting workers.
The Saguenay ferry
The STQ cut crossings from 27 August 2026 to the end of September for lack of deckhands. Radio-Canada reports that between 10:20 a.m. and 5:20 p.m. two vessels sailed every 20 minutes from each shore. The rest of the time one vessel gave a departure every 40 minutes or every hour. The Unifor representative ties recruitment to remoteness, wages and the difficulty of finding housing. In June 2026 the STQ said it takes five deckhands for the minimum safety crew on a vessel carrying 432 passengers. It advised avoiding the crossing between 11 a.m. and 6 p.m., when car traffic is heaviest.
For a site, that means scheduling module deliveries outside those hours and building in margins. Details rest with the STQ and the carrier, and depend on the season.
A bridge studied but far off
A bridge over the Saguenay is under study. Radio-Canada reported in April 2025 a cost of $4.2 billion, according to its sources, and that Quebec would allocate no money before 2030, with a listing in the infrastructure plan for 2030-2035. A project delivered in 2027 will therefore use the current ferry.
A heritage village and risk zones
The PIIA bylaw covers, for any new construction, the zones designated on the zoning plan, heritage buildings (before 1946) and any new construction on mountainous terrain. Council is also integrating a framework for landslides and shoreline erosion. Before ordering modules, check the lot's zone, its soil constraints and its connection to the networks. That is exactly what the June 2026 engineering mandate assesses for the water system. The article Is your land ready? gives the checklist.
Peak hours and winter work
The STQ advises avoiding the ferry between 11 a.m. and 6 p.m., when traffic is heaviest. The article Building in winter in Quebec shows what gets done in the factory while the ground freezes.
La Haute-Côte-Nord and neighbouring municipalities
The La Haute-Côte-Nord RCM has eight municipalities: Forestville (2,838 residents), Les Escoumins (1,753), Sacré-Coeur (1,685), Longue-Rive (881), Tadoussac (789), Les Bergeronnes (620), Colombier (614) and Portneuf-sur-Mer (582). Tadoussac is the only one in the RCM in the SDE portfolio announced in July 2026.
The closest neighbours have their own pages: Les Bergeronnes, Sacré-Coeur and Les Escoumins. Radio-Canada reported in April 2025 that in Sacré-Coeur the low-rent units were all occupied. For the whole region, the report on modular housing on the Côte-Nord places Tadoussac among the other projects.
A municipality or nonprofit preparing a housing project can request a quote on the /en/soumission page.
Housing organizations in Tadoussac
1 organization is registered with the SHQ in Tadoussac.
- Office municipal d'habitation de Tadoussac
In the La Haute-Côte-Nord MRC
- Office municipal d'habitation de Bergeronnes
- Office municipal d'habitation de Colombier
- Office municipal d'habitation de Forestville
- Office municipal d'habitation de Les Escoumins
- Office municipal d'habitation de Sacré-Coeur
- Office municipal d'habitation de Sainte-Anne-de-Portneuf
- Logis Escouminois (Les)
- Pignons populaires du Sacré-Coeur Inc. (les)
- Villa Forestville
Source: Housing organizations directory, Société d’habitation du Québec.
Frequently asked questions
How many affordable units are planned in Tadoussac?
What will rent be in the new Tadoussac units?
Are there rentals available in Tadoussac?
Where can I find land for sale in Tadoussac?
How much does a house cost in Tadoussac?
Is there social housing in Tadoussac?
Is there a seniors' residence in Tadoussac?
Who should I contact about a housing project in Tadoussac?
What complicates building in Tadoussac?
When could a project be delivered in Tadoussac?
Sources
- Environ 400 logements abordables pour l'Est-du-Québec — Radio-Canada, July 17, 2026
- Est du Québec : près de 500 logements abordables verront le jour — La Presse, August 22, 2026
- Une coopérative de solidarité pour contrer la dévitalisation de Tadoussac — Radio-Canada, September 4, 2026
- Tadoussac veut entendre ses citoyens — Le Haute Côte-Nord, October 21, 2026
- Procès-verbal de la séance extraordinaire du 15 juin 2026 — Municipalité du Village de Tadoussac, June 15, 2026
- Procès-verbal de la séance ordinaire du 9 juin 2026 — Municipalité du Village de Tadoussac, June 9, 2026
- Procès-verbal de la séance ordinaire du 10 mars 2026 — Municipalité du Village de Tadoussac, March 10, 2026
- Procès-verbal de la séance ordinaire du 13 janvier 2026 — Municipalité du Village de Tadoussac, January 13, 2026
- Procès-verbal de la séance ordinaire du 14 juillet 2026 — Municipalité du Village de Tadoussac, July 14, 2026
- Règlements d'urbanisme de Tadoussac — Municipalité du Village de Tadoussac, January 1, 2026
- Programmes d'aide financière — Municipalité du Village de Tadoussac, January 1, 2026
- Des résidents de Tadoussac dénoncent le manque de logements disponibles — Radio-Canada, April 13, 2022
- Le logement, un enjeu électoral en Haute-Côte-Nord — Radio-Canada, April 16, 2025
- Vitalité économique : la Haute-Côte-Nord parmi les pires MRC — Radio-Canada, October 21, 2025
- Moins de traversées entre Tadoussac et Baie-Sainte-Catherine — Radio-Canada, August 25, 2026
- L'Armand-Imbeau II reprend du service samedi à Tadoussac — Radio-Canada, June 19, 2026
- 4,2 G$ pour la construction d'un pont sur le Saguenay — Radio-Canada, April 29, 2025
- Tadoussac envisage d'imposer une taxe aux touristes — Radio-Canada, February 22, 2026
- Profil socio-économique de Tadoussac — Municipalité du Village de Tadoussac, January 1, 2026
- 2021 Census Profile, Tadoussac — Statistics Canada, February 9, 2022
- Répertoire des municipalités du Québec — Ministère des Affaires municipales et de l'Habitation, Données Québec
- Répertoire des organismes d'habitation — Société d'habitation du Québec

8Module
Modular multi-residential buildings (6 to 24+ units) factory-built in Quebec.
Visit websiteCommercial partnership — we receive compensation. Disclosure