Matane at a glance
| Region | Bas-Saint-Laurent |
| MRC | La Matanie |
| Population | 14,201 |
| Area | 230.43 km² |
| Demonym | Matanais, aise |
| Incorporated | 2001 |
Modular construction in Matane
As elsewhere in the La Matanie MRC, residential projects in Matane most often happen on private land — the context where the modular approach makes the most sense. The home is factory-built, sheltered from the weather, then transported and assembled on a permanent foundation, reducing time spent on site accordingly.
The real budget for a project in Matane is made up of the building, the land, the foundation, the connections and transport. Each item varies with the lot you choose: a lot served by municipal water is not the same job as one needing a well and septic system. Financing, for its part, works like any other property once the home sits on its foundation.
Read the complete modular home guide · Detailed prices · Choosing a builder
Permits and regulations in Matane
A factory-built home answers to two frameworks in Matane: CSA A277 certification for everything made in the plant, and the Quebec Building Code (RBQ) plus the local zoning by-law for everything that happens on the lot — mandatory municipal permit, setbacks and height per zone, municipal inspection of on-site work.
Check zoning rules and permit applications directly with the municipality: www.ville.matane.qc.ca.
Where to find the rules in Matane
Rules are specific to Matane and the target zone. Before buying land or ordering modules, confirm these with the relevant authorities:
- Zoning & planning by-laws — Permitted uses, setbacks, height and siting — and whether factory-built homes are allowed in the target zone in Matane. www.ville.matane.qc.ca →
- Building permit — Application form, required documents and timelines from Matane's planning department. www.ville.matane.qc.ca →
- Regional land-use plan — Regional land-use designations, managed by the La Matanie MRC. View →
- Agricultural zone (CPTAQ) — If the lot is in an agricultural zone, Commission authorization may be required before building. www.cptaq.gouv.qc.ca →
- Septic systems & wells — Off municipal services, Regulation Q-2, r.22 governs septic installations. www.environnement.gouv.qc.ca →
- Building code & RBQ licence — Verify your builder's RBQ licence and Quebec Building Code requirements. www.rbq.gouv.qc.ca →
- Guide: building permits in Quebec — Our step-by-step guide to permit procedures for a modular building. View →
- Modular construction glossary — Zoning, minor variance, CSA A277, turnkey… every project term explained simply. View →
- In person — Matane city hall: 230, avenue Saint-Jérôme.
Modular builders serving Matane
Modular buildings are factory-built then transported to the site, so a builder does not need to be based in Matane to deliver a project there. Most Quebec factories serve the entire province, including Bas-Saint-Laurent. Always verify the company's RBQ licence and get several quotes.
8Module
Modular multi-residential buildings (6 to 24+ units) factory-built in Quebec.
Visit websiteCommercial partnership — we may receive compensation. Disclosure
To compare manufacturers active in Quebec, see our modular builders guide.
Articles mentioning Matane
Our guides and coverage that mention Matane or projects in the area.
Construire un multiplex modulaire (6, 12 ou 24 logements) au Québec : délais, coût par porte, processus d'assemblage et zonage. Le guide pour promoteurs.
Coût par porte, vitesse de mise en location, financement SCHL, risques et diligence : le portrait honnête du modulaire pour les promoteurs du Québec.
Loyers en forte hausse à Rimouski et Matane, 155 logements étudiants modulaires livrés en 10 mois : le portrait 2026 du modulaire au Bas-Saint-Laurent.
Portrait du Petit Matane : 6 logements modulaires en bois au centre-ville de Matane. Concept, échéancier annoncé, certifications et ce que ce modèle illustre.
