Sainte-Marie in numbers
| Population (2026 decree) | 13,938 |
| Area | 109.12 km² |
| MRC | La Nouvelle-Beauce |
| Region | Chaudière-Appalaches |
| Incorporated | 1978 |
| Planning and zoning | Official page |
| Building permits | Official page |
| Planning bylaws | Official page |
| Council minutes | Official page |
| Housing | Official page |
| Municipal website | www.sainte-marie.ca |
In brief: Sainte-Marie housing is being rebuilt on the far side of Highway 73. Since the April 2019 flood and the demolition of nearly 400 homes, the City has opened an 84-hectare district whose phase 1 holds 1,100 units, and in February 2026 its council approved two 18-unit buildings on rue des Parulines. The city's public housing belongs to a regional office, and no nonprofit is based in Sainte-Marie itself. A modular project finds land outside the floodplain and a City that has already adjusted its zoning for multi-unit buildings.
Sainte-Marie is the central town of the La Nouvelle-Beauce RCM, in Chaudière-Appalaches. The MAMH directory gives it 13,938 residents over 109.12 km2. Its Beauce neighbours Saint-Georges, Beauceville and Saint-Joseph-de-Beauce also have pages.
Sainte-Marie by the numbers: what the data says
The 2021 census counted 13,134 residents, down from 13,565 in 2016, a drop of 3.2% (Statistics Canada). The decline follows the 2019 flood: hundreds of homes disappeared and their occupants left. The MAMH directory now shows 13,938 residents, and the City repeats that figure on its Sainte-Marie en chiffres page.
Of 5,500 households, 3,875 own (70.5%) and 1,625 rent (29.5%). The median rent paid in 2021 was $710 a month, the median owner cost $870, and the median dwelling value $240,000. Only 13.9% of tenants spent 30% or more of income on housing, and 2.8% were in core housing need. Those shares are low, and they predate the rent increases of 2022 to 2026. They do not describe today's pressure.
The 5,630-dwelling stock shows the 2019 break. Only 610 dwellings date from before 1961 (11.1%), while 1,560 date from 1961 to 1980 (28.4%). The old downtown houses near the river were among the hardest hit by demolitions. From 2016 to 2021, 455 dwellings were built (8.3%). The median age is 44, 22.5% of residents are 65 or older, and households average 2.3 people. Only 175 dwellings (3.2%) needed major repairs.
The City counts 38 industries and 530 businesses. The Vachon plant, beside the river, is the best-known employer: its owner spent $10 million on flood walls rather than leave (Radio-Canada, May 2024).
Sainte-Marie housing: what is happening
The district east of Highway 73
84 hectares, 1,100 units in phase 1
On October 8, 2025, the City turned the first sod of its future urban perimeter, an 84-hectare site east of Highway 73 starting at route Saint-Martin. Phase 1, one of three, runs to 2028 and holds 1,100 units: multi-unit buildings, semi-detached homes and single-family houses (Beauce Média, October 8, 2025). The mayor of the day said: "Starting next year, we will have new homes in Sainte-Marie!" Radio-Canada described a 1,250-unit, three-phase project in 2024.
Five years of approvals
The City's engineering director noted that the project took five years, notably with the agricultural land protection commission and several ministries (rezoning, wetlands). The slope of the site requires a water reservoir of about $5 million, due for completion at the end of summer 2026. The reservoir is the district's first expense: without it, no resident can move in.
Municipal services in the sector
Council has followed the file closely. On August 18, 2025, a private developer ceded lot 6 623 008 free of charge (14,071.50 m2, of which 8,637.80 m2 counted, the rest lying in a riparian strip) and paid $14,448.07 in compensation for parks and natural areas in phase 1 (minutes of August 18, 2025). For the neighbouring Honorius-Gagnon sector, council commissioned a sewage pumping station design with a backup generator for $21,725 on October 1, 2025. On December 8, 2025, it committed to the environment ministry to acquire and maintain the streets, water main, sewer, pumping station and retention basin (minutes of December 8, 2025).
Rue des Parulines: two 18-unit buildings
On February 9, 2026, council approved two three-storey multi-family residences of 18 units each, at 2101 and 2103 rue des Parulines, in sector B of the district east of Highway 73. The parking lots hold 30 and 32 spaces, 8 of each with an electric hookup, linked by a shared driveway. The architectural plan will serve every multi-family building on the street (minutes of February 9, 2026). The projects go through bylaw 1929-2025 on site planning and architectural integration (PIIA) and through the advisory planning committee.
On May 11, 2026, council unanimously refused the owner's request to remove sections of masonry on the façade. The committee recommended refusal: no technical impossibility was shown, and the original design was already approved (minutes of May 11, 2026). For a developer the message is plain: the façade masonry criterion holds, even when one plan serves a whole street.
Rue Bellevue: ten units in two-family homes
On April 13, 2026, council approved five two-storey two-family residences, 10 housing units in all, at 222 to 230 rue Bellevue, with a favourable recommendation from the advisory planning committee (minutes of April 13, 2026). Sainte-Marie's output therefore combines two formats: small 18-unit buildings and two-family homes built in series.
Rebuilding on boulevard Vachon Nord
Nine units after the 2019 demolition
On June 9, 2025, council granted minor variances to rebuild a three-storey building at 401 to 405 boulevard Vachon Nord, with 2 commercial units on the ground floor and 9 apartments above. It replaces a building damaged by the 2019 flood and demolished. Parking holds 20 spaces instead of 21, two 3 1/2 apartments have an 8.4 m2 balcony instead of 10 m2, and one studio has no attached balcony. The site is constrained by the floodplain, and residents will share a balcony and a rest area at the back (minutes of June 9, 2025).
A 16-unit building and its parking
On October 1, 2025, council approved parking variances for the 16-unit building at 1043 to 1045 boulevard Vachon Nord, partly in the floodplain: 26 spaces instead of 28, and aisles slightly narrower than the standard. The existing paved surface is redone and one driveway entrance removed to limit accesses to the boulevard (minutes of October 1, 2025).
Rue des Sentiers: about 500 apartments possible
Rue des Sentiers, on route Saint-Martin near the highway, was finished in August 2023. Private developers presented it to the City in April 2020, and the single-family zoning was changed to multi-unit and commercial. In November 2023, two confirmed projects amounted to 220 doors, with potential for about 300 more on 537,000 sq. ft. reserved for apartment buildings (Beauce Média, November 29, 2023). One of the developers said Sainte-Marie is among the Quebec towns that lack the most housing. That line is a developer's opinion, not a statistic.
The rules the City changed in 2026
On August 10, 2026, council took two steps that touch rental buildings.
- It asked for a sub-class of residential buildings with six or more units for the 2027-2028-2029 assessment roll, under the Act respecting municipal taxation (resolution 2026-08-379).
- It adopted the second draft of bylaw 1960-2026, which exempts multi-family residences from the requirement to front on a public or private road (section 14.4 of the zoning bylaw) (minutes of August 10, 2026).
The second change makes set-back buildings on a lot served by a shared driveway possible, which rue des Parulines already practises. The draft includes a provision open to a referendum. The base zoning remains bylaw 1391-2007, and the City's urban planning pages set out the permit steps.
The 2019 floods and what they left
The flood and the 33% threshold
The April 2019 flood exceeded the 100-year level by nearly a metre, reaching 147.7 m. The provincial program initially covered owners whose damage reached 50% of their home's value. The City chose to lower the bar to 33% to recover as much land as possible. Nearly 400 demolitions followed, and whole streets turned into lawns (Radio-Canada, May 28, 2024).
A downtown on the move
The new fire station, the rebuilt elementary school, then the city hall and library are going up far from flood zones, and downtown is re-forming around route Saint-Martin. The new residential districts lie in the same sector.
Who lost their housing
In October 2019, Radio-Canada reported that low-budget flood victims were leaving town: a tenant whose rented house at $600 a month had been destroyed found only rents of $900 to $1,100, and moved 30 km away, to Saint-Lambert-de-Lauzon (Radio-Canada, October 16, 2019). The loss hit the cheapest part of the stock. New rental buildings do not replace it, because a new unit rents for more than an old downtown house.
Students, workers and seniors
The college and the rooms
In September 2022, the Cégep Beauce-Appalaches had housed nearly 150 students in a year with its "Loge un étudiant" campaign. More than 400 buildings able to house students had been destroyed in Sainte-Marie in 2019, and the Sainte-Marie campus's animal health technology program takes cohorts of 40 students (Radio-Canada, September 9, 2022). For this segment, see modular student housing.
Worker demand
The developers of rue des Sentiers tied their project to the steady arrival of foreign workers. In Saint-Georges, the planning director links housing demand to foreign workers and to seniors from small towns moving closer to services (EnBeauce.com, March 16, 2026). Sainte-Marie employers look for the same workforce: see worker housing in the regions.
The closing of the Villa Sainte-Marie
The Villa Sainte-Marie, a private residence of 17 residents in a 1927 building, closed on January 31, 2026, and the building will be demolished. Its director cites Régie du bâtiment requirements (23 corrections, more than $600,000 without subsidy) and says no room was left in the town's other seniors' residences (Beauce Média, February 4, 2026). A new seniors' project faces the same compliance question: see the modular seniors' residence.
Homelessness and precarity
The Nouvelle-Beauce Homelessness Committee, formed in summer 2026, brings together community, municipal, police and health actors. Organizations report more requests for food aid and for help finding housing, and hidden homelessness (vehicle, trailer, staying with relatives) remains hard to measure (EnBeauce.com, October 13, 2026). Radio-Canada had already reported new cases of encampments in Sainte-Marie in 2019.
Vacancy and rents
CMHC does not publish a vacancy rate for Sainte-Marie in the region's sources. The nearest Beauce benchmark comes from Saint-Georges: 1% at the end of 2025, against a healthy rate of 2% to 3% according to its planning director. The Saint-Georges page details that market. The City's real estate directory, free for owners, showed zero listings in every category on October 22, 2026: apartment, room, public housing, house, condo and land.
Housing organizations in Sainte-Marie and the RCM
The Société d'habitation du Québec directory places no organization in Sainte-Marie. Five organizations are elsewhere in the RCM, for 67 subsidized units:
- Coopérative d'habitation St-Maxime de Scott, in Scott: cooperative, 5 rent-supplement units for single people.
- Le Petit domicile de St-Lambert, in Saint-Lambert-de-Lauzon: nonprofit, 16 public housing (HLM) units for seniors.
- Gîte de Saint-Isidore (Le), in Saint-Isidore: nonprofit, 21 rent-supplement units for seniors.
- La résidence du Verger inc., in Saint-Elzéar: nonprofit, 18 rent-supplement units for seniors.
- Domaine du couvent, in Vallée-Jonction: nonprofit, 7 rent-supplement units for seniors.
Four of the five serve seniors, and none targets families. Sainte-Marie's public housing, including the Habitations du Bocage, belongs to a regional office. The merger authorized by the SHQ brought six offices into one by January 1, 2025, with 1,145 HLM doors, community support linked to the CISSS and support for municipalities developing new housing (Beauce Média, October 8, 2024). The Office d'habitation du Sud des Appalaches groups the offices of Lotbinière, Sud de la Chaudière, Appalaches, Granit and Nouvelle-Beauce. Its site lets applicants check their rank, file a request and view the property portfolio. Sainte-Marie's waiting list is not published.
A housing office manages public housing and can carry new projects. A housing nonprofit is a private organization that builds, owns and manages affordable units. A cooperative belongs to its tenants. A municipality works with them by granting or leasing land, paying its contribution to programs and adapting its zoning.
What a municipality the size of Sainte-Marie can do
Sainte-Marie has already used several levers: the multi-unit zoning of rue des Sentiers, bylaw 1960-2026 on set-back buildings, the tax sub-class for buildings of six units or more, and the infrastructure of an entire district. What it lacks, in its public documents from October 2025 to September 2026, is a nonprofit project or a municipal construction subsidy program.
For a town of nearly 14,000 residents, three paths stand out.
- Land for a nonprofit or the office. In the new district, a lot granted to a nonprofit under the municipal land transfer framework would produce affordable housing without inflating the starting price. The City already obtains lot cessions as park compensation.
- Stream 3 of the PHAQ. The required municipal contribution weighs less on a town that has already serviced its land: see stream 3 explained for councils and the municipal contribution examples.
- A portfolio with its neighbours. Saint-Georges (41 affordable units), Beauceville and Sainte-Marie each have projects too small to order alone. The municipal housing portfolio model groups them, with the manufacturers selected by the SDE.
The small-municipality affordable housing guide gives the order of steps. The regional article places Chaudière-Appalaches within Quebec as a whole.
Building modular in Sainte-Marie
The first fact is water. The boulevard Vachon Nord projects sit partly in the floodplain: parking space, balconies and access are what gets negotiated through variances. A modular building sits on a prepared foundation at a chosen floor level, but crane and truck access cannot be negotiated by variance: it has to be studied first.
The second fact is slope. The eastern district has a significant grade, which forced a $5 million water reservoir and a retention basin. On a sloping lot, delivering long modules calls for a precise site access plan.
The third fact is the shape of the projects: 18-unit, three-storey buildings repeated along a street from one plan. Repetition favours prefabrication, because a single plan is produced in series. Permit timelines follow the PIIA procedure: review by the advisory planning committee, then a council resolution. For modular project timelines, see the modular project schedule, and for cold-season work, the guide to building in winter.
Sainte-Marie sits on Highway 73, between Lévis and Saint-Georges. The costs of a six to twenty-four-unit building are described in the price guide and vary by project.
La Nouvelle-Beauce RCM and neighbouring towns
Sainte-Marie is the largest of the eleven municipalities of the La Nouvelle-Beauce RCM, ahead of Saint-Lambert-de-Lauzon (7,588 residents), Saint-Isidore (3,553), Scott (2,947), Saint-Elzéar (2,845), Saint-Bernard (2,694), Vallée-Jonction (2,044), Sainte-Hénédine (1,549), Frampton (1,373), Saints-Anges (1,369) and Sainte-Marguerite (1,299). The RCM's offices and nonprofits have mainly served seniors. To the south, the pages for Saint-Georges, Beauceville and Saint-Joseph-de-Beauce describe neighbouring markets.
A municipality or nonprofit preparing a housing project can request a quote on the quote page.
Housing organizations in Sainte-Marie
No housing organization is registered with the SHQ in Sainte-Marie. Here are the ones elsewhere in the La Nouvelle-Beauce MRC.
In the La Nouvelle-Beauce MRC
- Coopérative d'habitation St-Maxime de Scott
- Domaine du couvent
- Gîte de Saint-Isidore (Le)
- La résidence du Verger inc.
- Le Petit domicile de St-Lambert
Source: Housing organizations directory, Société d’habitation du Québec.
Frequently asked questions
Is there new housing in Sainte-Marie?
What is the vacancy rate in Sainte-Marie?
Where can I find land for sale in Sainte-Marie?
Is there public housing in Sainte-Marie?
Can I check my rank on a public housing waiting list?
Where can seniors live in Sainte-Marie?
How many homes were demolished after the 2019 floods?
Can a student rent a room in Sainte-Marie?
How do I get a building permit in Sainte-Marie?
Whom do I contact for an affordable housing project in Sainte-Marie?
Sources
- Futur périmètre urbain: Sainte-Marie va s'étendre — Beauce Média, October 8, 2025
- Séance ordinaire du 9 février 2026 — Ville de Sainte-Marie, February 9, 2026
- Séance ordinaire du 11 mai 2026 — Ville de Sainte-Marie, May 11, 2026
- Séance ordinaire du 13 avril 2026 — Ville de Sainte-Marie, April 13, 2026
- Séance ordinaire du 9 juin 2025 — Ville de Sainte-Marie, June 9, 2025
- Séance ordinaire du 1er octobre 2025 — Ville de Sainte-Marie, October 1, 2025
- Séance ordinaire du 10 août 2026 — Ville de Sainte-Marie, August 10, 2026
- Séance ordinaire du 18 août 2025 — Ville de Sainte-Marie, August 18, 2025
- Séance ordinaire du 8 décembre 2025 — Ville de Sainte-Marie, December 8, 2025
- Sainte-Marie pourra respirer — Beauce Média, November 29, 2023
- Les dures leçons de la rivière Chaudière — Radio-Canada, May 28, 2024
- Inondations : les sinistrés à petit budget forcés de quitter Sainte-Marie — Radio-Canada, October 16, 2019
- Le défi de loger les étudiants du Cégep Beauce-Appalaches — Radio-Canada, September 9, 2022
- Villa Sainte-Marie: étouffée par le poids des réglementations — Beauce Média, February 4, 2026
- Le regroupement des OMH ira de l'avant — Beauce Média, October 8, 2024
- Un nouveau départ pour l'Office d'habitation du Sud des Appalaches — OH du Sud des Appalaches, January 1, 2026
- Le Comité itinérance Nouvelle-Beauce voit le jour — EnBeauce.com, October 13, 2026
- Sainte-Marie en chiffres — Ville de Sainte-Marie, January 1, 2026
- Répertoire immobilier — Ville de Sainte-Marie, October 22, 2026
- Ça construit à Saint-Georges — EnBeauce.com, March 16, 2026
- Urbanisme — Ville de Sainte-Marie, January 1, 2026
- Répertoire des municipalités du Québec — MAMH, October 22, 2026
- Répertoire des organismes d'habitation — Société d'habitation du Québec, October 22, 2026
- Profil du recensement de 2021, Sainte-Marie — Statistique Canada, February 9, 2022

8Module
Modular multi-residential buildings (6 to 24+ units) factory-built in Quebec.
Visit websiteCommercial partnership — we receive compensation. Disclosure