Bécancour in numbers
| Population (2026 decree) | 14,788 |
| Area | 495.28 km² |
| MRC | Bécancour |
| Region | Centre-du-Québec |
| Incorporated | 1965 |
| Planning and zoning | Official page |
| Building permits | Official page |
| Planning bylaws | Official page |
| Council minutes | Official page |
| Housing | Official page |
| Municipal website | www.becancour.net |
In brief: Bécancour housing is driven by the industrial and port park: the city created a record 253 homes in 2024 and expects 17,800 residents as early as 2027. The vacancy rate was 0.3% in 2023 according to CMHC. Since then battery-sector construction sites have slowed and housing starts fell 26% in 2025, but about 6,700 homes are still projected over ten years. For a modular project, the main constraint is how long the city takes to approve municipal services: 6 months to 2 years.
Bécancour housing by the numbers: what the data says
Bécancour has 14,788 residents according to the Quebec municipal directory. The 2021 census counted 13,561, up 4.1% from 2016 (13,031). The 2024 population decree counted 14,438. The city sits in the Bécancour MRC, in Centre-du-Québec, and covers 495 km² in six sectors: Bécancour, Gentilly, Précieux-Sang, Sainte-Angèle-de-Laval, Sainte-Gertrude and Saint-Grégoire.
The housing stock is 6,348 dwellings, of which 6,034 are occupied by usual residents. About 1,495 (23.5%) predate 1961 and as many date from 1961 to 1980. Building continued afterwards: 625 dwellings from 2006 to 2010, 520 from 2011 to 2015 and 515 from 2016 to 2021. About 360 dwellings (6%) need major repairs.
Households are younger than in the MRC: the median age is 44 (47 for the MRC according to the city), 22.3% of residents are 65 or over and households average 2.2 people. Owners make up 74.9% of households (4,520) and renters 25.1% (1,515). The city cites 78% owners and 76% detached single-family homes, followed at 15% by apartments in buildings of fewer than 5 units. Median shelter cost is $596 a month for renters and $860 for owners. The median value of an owned dwelling is $200,000.
In 2021 the strain was still low: 11.1% of renters spent 30% or more of income on housing (5.6% of owners), and 3.7% of renters were in core housing need. Those figures predate the battery-sector construction sites. According to La Presse, citing CMHC, Bécancour and Trois-Rivières had the lowest vacancy rate in 2023, at 0.3%. No more recent CMHC figure is published for Bécancour.
What is happening in Bécancour housing
The city says it in its own documents: the battery sector is speeding up growth, and housing has not kept pace. The facts below separate what the city has built, what it has approved and what the regional economy is changing.
A record 253 homes created in 2024, then 153 in 2025
Each month the city publishes the number of homes created through new residential construction permits. The annual totals trace a bell curve: 57 in 2016, 112 in 2019, 148 in 2020, 206 in 2021, 193 in 2022, 140 in 2023, then 253 in 2024, the highest in the series. 2025 has 153. From January to June 2026 there are 58, of which 57 are new construction.
Permit counts tell the same story: 81 new construction permits in 2024, 66 in 2025 and 32 in the first half of 2026. Since one permit can cover several homes, the total of homes is what counts. CMHC starts data, relayed by APCHQ, point the same way: 125 starts from January to November 2025 against 168 a year earlier, 26% fewer.
17,800 residents and 6,700 homes projected
The 2025 Developer Kit gives the official projections. The city could reach 17,800 people as early as 2027, 16.3% more than the 2024 decree. It counts 2,136 homes built from 2001 to 2023 and expects about as many additional households in only three years, with projections around 2,364 homes by 2027. Over ten years the city projects about 6,700 units across its territory.
These projections predate the slowdown at the plants. They serve as a planning frame: they explain why the city created a sustainable growth committee, a charter and a multi-step approval process for developers.
The Accès logement Bécancour initiative
In February 2025 the city launched Accès logement Bécancour to stimulate affordable housing construction. It teamed up with partners on studies of renters' needs: where to build, what size, at what price. The city aimed for at least two real estate projects with 10% affordable units in 2025. It cited a 0.3% vacancy rate and a population up 12% between 2019 and 2024.
The mayor of the time, Lucie Allard, summed up the problem this way: many projects, but not enough affordable units built into them. In the mayor's showcase of 14 October 2026, the city says it asked Quebec to increase affordable housing aid and to simplify regulatory requirements that raise project costs.
Holocie coop: 24 affordable homes in Sainte-Angèle
On 15 September 2025 council adopted a resolution of support for a project by the cooperative Holocie coop: 24 affordable homes at the end of avenue Pierre-Laporte, in the Sainte-Angèle sector. The project is valued at over $8 million. The city commits to contribute about 20% of its value, at least $1.6 million for a project valued at over $8 million.
What the city's help includes
Municipal help covers the land purchase, a municipal tax credit over 20 years, a refund of the building permit and various technical studies. It is a concrete model of municipal contribution for a nonprofit or cooperative: the city does not lend, it takes on the costs that block a project before financing. The guide to the municipal contribution to PHAQ shows how such a percentage compares with program requirements.
Multi-unit projects accepted by council
The city's developer page lists the preliminary requests council has accepted, meaning projects for which the city agrees to extend its services:
- 8 July 2024, Gentilly. Four multifamily lots for 4 detached 3-storey buildings, 48 homes in all, behind the fire station. Phase II will add 24 homes in one or two buildings.
- 8 July 2024, Gentilly. 33 lots for 17 semi-detached houses in phase I, with 16 more lots in phase II.
- 19 August 2024, Saint-Grégoire. In the avenue Hélie sector, 8 multifamily buildings of 16 homes, a commercial building of 5 units and 2 mixed-use buildings with about 300 homes.
- 13 April 2026, Gentilly. A private seniors' residence of 167 rooms and 12 homes, with a supermarket.
The three multi-unit projects of 2024 add up to about 500 homes (48 and 24 in Gentilly, 128 in 16-unit buildings and about 300 in mixed-use buildings in Saint-Grégoire), roughly 7% of the 6,700 units projected over ten years. That is an order of magnitude, not a schedule: an accepted project is not a built project, as the Kit's glossary reminds readers.
An 850-home project offered to developers in Sainte-Angèle-de-Laval
In October 2024 a call for developers presented a project of more than 850 homes and a few commercial spaces on 55,750 m², 10 minutes from downtown Trois-Rivières and the industrial park, according to La Presse. The document sets a parking ratio of 0.75 and towers of up to eight storeys. A professor at the Université de Montréal's school of urban planning quoted by the paper called that height out of the ordinary in a rural setting, while judging the project justified by need. The city was then studying a shuttle service to the industrial park.
A project of that size does not appear, at this date, in the city's list of accepted preliminary requests. The project's status is not confirmed.
Zoning that caps height
On 2 February 2026 council gave notice of motion for a bylaw (1851) that cuts the maximum height of mixed-use buildings in zone C02-220, in the Bécancour sector, from 4 to 3 storeys and changes the split between commerce and housing. The same day it gave notice of motion for a bylaw (1853) creating zone H01-122.1 in Gentilly to allow a private seniors' residence near rue des Albatros. The minutes of 2 February 2026 also record the sale of three municipal lots for residential construction: one lot on avenue des Capucines (Sainte-Angèle-de-Laval) at $87,500 and two lots on rue des Pommiers (Sainte-Gertrude) at $74,400.
The cut from 4 to 3 storeys in a mixed-use zone shows the city densifying while keeping height under control in village sectors. For a multi-unit building, modular or not, the zone grid decides.
The industrial and port park: what drives demand
The Société du parc industriel et portuaire de Bécancour (SPIPB) park is one of the largest in Canada, with nearly 7,000 hectares according to the Developer Kit. In its 8 January 2026 review, the SPIPB counts more than 40 companies, economic spinoffs above a billion dollars for Mauricie and Centre-du-Québec and $700 million of industrial and port infrastructure by 2029. On 13 July 2026 Quebec announced $200 million over two years to develop the land south of highway 30 and support the port modernization project.
On the plant side the picture is mixed. On 13 March 2026 Rio Tinto announced it is slowing construction of the Nemaska Lithium hydroxide plant, more than 70% built, with a temporary cut in subcontractor staff. Quebec confirmed a final investment of up to US$200 million in February 2026 for the project, which could create up to 500 permanent jobs, and first production is aimed at 2028. In November 2025 Ultium Cam slowed construction of its cathode plant, affecting more than a hundred site workers, after pausing its phase 2.
For housing demand, two effects pull in opposite directions. Site workers, who live nearby for the duration of the work, decrease when sites slow. The permanent jobs announced, up to 500 for Nemaska Lithium, arrive after commissioning. The 2027-2037 strategic plan unveiled on 16 October 2026 names growing pressure on housing, infrastructure and services, and dependence on large industrial projects.
Multi-unit construction and new construction in Bécancour: zoning and approval
Searches about multi-unit construction in Bécancour almost all lead to the same question: how to get a project approved. The city answered with a written process in its Developer Kit and in bylaw 1473 on municipal works agreements.
Steps and timelines for a residential project
When a project requires extending the street or the water and sewer networks, the city opens an analysis process that takes 6 months to 2 years depending on the project. Here are the steps and the average durations it publishes:
| Step | Average duration |
|---|---|
| Request analysis and department recommendations | Variable |
| Sustainable growth committee | Up to 1 month |
| Acceptance or refusal by council | Up to 1 month |
| Zoning change, if required | 4 to 5 months |
| Ecological and environmental studies | 6 months to 1 year |
| Wetland authorization certificate, if required | 6 to 9 months |
| Plans and specifications, mobility committee, estimate | 6 months to 1 year |
| Environment ministry authorization | 1 to 9 months |
| Developer agreement | 1 to 2 months |
| Call for tenders | 1 month |
| Subdivision permit | 45 days maximum |
| Services works (sewer, water, roads) | 2 weeks to 3 months |
Some steps run in parallel, so the durations do not all add up. Paving is done a year after the services works so the street goes through a freeze-thaw cycle. Building permits follow, with a variable delay.
Height, zones and grids: what decides
Zoning bylaw 1787 was rewritten along with the urban plan, and its use and standards grid (annex 1) sets for each zone the uses, setbacks, height and number of storeys. The February 2026 notice of motion brings the maximum in one mixed-use zone of the Bécancour sector down to 3 storeys. According to the Kit, Gentilly has the greatest residential development potential in the territory, with more than 50% of the space earmarked for the short term, and Saint-Grégoire is the sector that grew the most from 2001 to 2023. In the Bécancour sector, all vacant space available for housing is already developed.
Building permits, foundation walls and land in Bécancour
Building permit: timing, filing and plans
The city recommends filing an application at least 45 days before work starts, online. The file needs the applicant's details, a scaled construction plan, a cost estimate, a scaled site plan, the contractor's name, the type of use and the planned start and end dates. Fees are in annex B of bylaw 1838 on 2026 fees. The urban planning and environment department answers at 819 294-6500. Our article on building permits and modular construction describes the general sequence.
Foundation wall: what zoning says and what the pyrrhotite aid covers
For zoning, the foundation wall is a reference point: the setback is measured from the outer face of the foundation wall, unless the exterior wall projects beyond it. Cladding may project up to 0.15 m without changing the measurement. On the shore or littoral of a lake or watercourse, the bylaw also forbids, for a non-conforming building, closing in the perimeter of a structure on piles, posts or blocks with a continuous foundation wall.
For foundations damaged by pyrrhotite, the city publishes an aid program. Stream I refunds 75% of eligible costs up to $75,000 for a building without a new residential building warranty plan, when the lab confirms at least 0.23% pyrrhotite by volume. Stream II, which paid for expert reports, closed registrations on 30 September 2021 and targeted buildings built from 1996 to 2008. These rules concern owners of existing homes, not new construction. For a new foundation, the reference remains the Quebec Construction Code: see the article on the construction code and modular.
Land for sale in Bécancour
In February 2026 the city sold three municipal lots for residential construction: $87,500 for a lot on avenue des Capucines and $74,400 for two lots on rue des Pommiers. Since 2024 it has also posted listings for owners of undeveloped vacant land. A lot that is not next to a public or private street, or has no water and sewer in the street, needs an agreement with the city before subdivision or construction. Before buying, check the street, the services and the zone. Our guide to build-ready land details those checks, and the one on wells, septic and connections covers unserviced sectors.
Apartments for rent, worker housing and seniors in Bécancour
The rental market is tight: 1,515 renter households in 2021, a 0.3% vacancy rate in 2023 and only 15% of homes in apartments within buildings of fewer than 5 units. The census median rent ($596) is well below advertised rents today, and the mayor herself noted that housing has become very expensive, a reality the city did not know before. For workers, the article on workforce housing in the regions describes the formulas that exist.
For seniors, the main project is the 167-room, 12-home private residence in Gentilly. The only public stock is the housing office's, described below. The article on modular seniors' residences gives cost and timeline benchmarks.
Housing organizations in Bécancour and the MRC
The SHQ directory of housing organizations lists two organizations in Bécancour and none elsewhere in the MRC.
- Office municipal d'habitation de Bécancour (housing office, Bécancour): 233 public housing (HLM) units, 104 for families and 129 for seniors. A housing office manages the SHQ's low-rent units for low-income households.
- La Chrysalide (nonprofit, Bécancour): community mental health residence, with no subsidized units listed in the directory.
So the directory shows no housing cooperative and no subsidized nonprofit in the MRC's other municipalities. The Holocie coop project in Sainte-Angèle plans 24 affordable homes. The guide to municipal land and nonprofits describes how a town works with such an organization.
What a municipality the size of Bécancour can do
With nearly 15,000 residents, Bécancour has the staff to negotiate with developers, which few towns in its region can do. Here is what its own practice shows.
Set requirements in writing
The Developer Kit, adopted in 2025 after the Bâtir ensemble process (two information sessions and six sector coffee talks), passes each sector's residents' views on to developers. The sector sheets note, for example, that Gentilly residents want balanced density, and that some suggest green interior courtyards for multi-unit buildings.
Contribute in kind rather than in cash
The support for Holocie coop (land, a 20-year tax credit, permit refund, studies) is an in-kind contribution of about 20% of the project's value. The guide to affordable housing in small municipalities and the one on PHAQ stream 3 explain how that share fits with the programs.
Reserve affordable units in private projects
The city aimed for 10% affordable units in at least two projects in 2025. The Kit says an affordable housing policy was being drafted for adoption in 2025. The article on financing affordable modular housing compares the structures.
Plan transit together with housing
Public transit to Trois-Rivières ends according to an announcement of 23 September 2026. On 13 October the Bécancour MRC announced a temporary shuttle from 19 October to 18 December 2026, Monday to Friday, to the Cégep de Trois-Rivières and the Hôpital Sainte-Marie, with departures at 7:10 and 7:20 from Bécancour. The professor quoted by La Presse doubted that a ratio of 0.75 parking space per home, planned for the Sainte-Angèle-de-Laval project, would hold in the long run without public transit.
Building modular in Bécancour
Bécancour is halfway between Montréal and Québec, on the St. Lawrence, at the junction of the highway axes (highways 30 and 55). The terrain is flat, mostly farmland and forest, with eight major rivers and two lakes. For a site, a few constraints keep coming up:
- Services. A lot with no adjacent water and sewer needs a developer agreement and can add 6 months to 2 years.
- Wetlands and flood zones. The Kit lists flood zones, shoreline strips, wetlands and landslide-risk zones among the components to consider. Ecological studies take 6 months to 1 year.
- Traffic. According to La Presse (2024), the mayor reported residents' concern about vehicle numbers and accidents on highway 30 since the battery sector arrived.
- Winter. Paving is done a year after the services, to get through a freeze-thaw cycle.
- Height. The projects accepted in Gentilly are 3-storey buildings, and a mixed-use zone in the Bécancour sector drops from 4 to 3 storeys maximum.
The Sainte-Angèle-de-Laval sector is 10 minutes from downtown Trois-Rivières according to La Presse. For choosing a system and costs for a multi-unit building, see the developers' guide and the page on the cost of a 6, 12 or 24-unit building, whose ranges vary by project.
The Bécancour MRC and neighbouring municipalities
The Bécancour MRC has 12 municipalities: Bécancour (14,788 residents) dominates, ahead of Saint-Pierre-les-Becquets (1,200), Deschaillons-sur-Saint-Laurent (947), Manseau (875), Saint-Sylvère (790), Sainte-Sophie-de-Lévrard (770), Fortierville (681), Parisville (523), Sainte-Marie-de-Blandford (480), Sainte-Françoise (470), Sainte-Cécile-de-Lévrard (343) and Lemieux (289). The MRC's median age is 47 according to the city. The MRC also took on the temporary shuttle to Trois-Rivières.
The region is described on the Centre-du-Québec page and in the article on modular housing in Centre-du-Québec. The neighbouring town of Nicolet has its own page, with its rental projects and interim control bylaw. The other municipalities in the MRC do not have a page yet.
A municipality or nonprofit preparing a project can request a quote on the quote page.
Housing organizations in Bécancour
2 organizations are registered with the SHQ in Bécancour.
- Office municipal d'habitation de Bécancour
- La Chrysalide Maison d'hébergement communautaire en santé mentale
Source: Housing organizations directory, Société d’habitation du Québec.
Frequently asked questions
How many homes are built each year in Bécancour?
What is the vacancy rate in Bécancour?
Where can I find an apartment for rent in Bécancour?
Is there public housing or social housing in Bécancour?
How long does it take to get a residential project approved in Bécancour?
When should I apply for a building permit in Bécancour?
How is the setback measured from the foundation wall in Bécancour?
Is there aid for damaged foundations in Bécancour?
Is there land for sale in Bécancour?
Is there housing for battery-sector workers in Bécancour?
Is there a seniors' residence in Bécancour?
When does council adopt the 2027-2037 strategic plan?
Sources
- Permis pour nouvelles constructions résidentielles de 2016 à 2026 — Ville de Bécancour, July 20, 2026
- Trousse du promoteur, édition 2025 — Ville de Bécancour, October 1, 2025
- Promoteurs, projets à venir à court terme — Ville de Bécancour, October 21, 2026
- Diffusion en bref, septembre 2025 — Ville de Bécancour, September 1, 2025
- Bécancour veut stimuler la construction de logements abordables — Radio-Canada, February 20, 2025
- Bécancour : un projet de 850 logements près de la filière batterie — La Presse, October 16, 2024
- Marché de l'emploi et construction, novembre 2025 — APCHQ, November 30, 2025
- Résolutions de la séance ordinaire du 2 février 2026 — Ville de Bécancour, February 2, 2026
- Planification stratégique 2027-2037 — Ville de Bécancour, October 16, 2026
- Vitrine du maire — Ville de Bécancour, October 14, 2026
- Une année 2025 résolument active pour la SPIPB — Société du parc industriel et portuaire de Bécancour, January 8, 2026
- Mise à jour sur le projet de Nemaska Lithium à Bécancour — Rio Tinto, March 13, 2026
- Un autre coup dur pour la filière batterie à Bécancour — Radio-Canada, November 12, 2025
- Des mesures d'atténuation temporaire pour maintenir l'accès à Trois-Rivières — MRC de Bécancour, October 13, 2026
- Permis et certificats — Ville de Bécancour, October 21, 2026
- Profil du recensement de 2021, Bécancour — Statistique Canada, February 9, 2022
- Répertoire des municipalités du Québec — Ministère des Affaires municipales et de l'Habitation, October 21, 2026
- Répertoire des organismes d'habitation — Société d'habitation du Québec, October 21, 2026

8Module
Modular multi-residential buildings (6 to 24+ units) factory-built in Quebec.
Visit websiteCommercial partnership — we receive compensation. Disclosure