The Antoine-Labelle sector brings together 17 municipalities and about 38,184 residents, in Laurentides. This page gathers the useful landmarks for a modular project on this territory: the municipalities served, local procedures and the manufacturers that deliver here.

Estimate costs

Towns with a local guide

All municipalities in the area

Modular construction serves the entire area, including the following municipalities:

  • Rivière-Rouge4,883 res. · Riverougeois, oise
  • Lac-des-Écorces3,019 res. · Écorçois, oise
  • Ferme-Neuve2,816 res. · Fermeneuvien, ienne
  • Nominingue2,288 res. · Nomininguois, oise
  • Notre-Dame-du-Laus1,910 res. · Lausois, oise
  • Chute-Saint-Philippe1,155 res. · Philichutois, oise
  • La Macaza1,138 res. · Macazien, ienne
  • L'Ascension981 res. · L'Ascensois, oise
  • Notre-Dame-de-Pontmain884 res.
  • Saint-Aimé-du-Lac-des-Îles842 res. · Aimélois, oise
  • Kiamika832 res. · Kiamikois, oise
  • Lac-Saguay599 res. · Lac-Saguayen, enne
  • Mont-Saint-Michel597 res. · Michelmontois, oise
  • Sainte-Anne-du-Lac572 res. · Tapanois, oise
  • Lac-Saint-Paul567 res. · Paulacquois, oise
  • Lac-du-Cerf499 res. · Cervois, oise

Modular in the Antoine-Labelle sector

A traditional job site ties up local trades for months; modular flips that logic. Most of the building is completed in a factory, often outside the Antoine-Labelle sector, before being moved to the project's municipality. On site, only the foundation, assembly and connections remain — a short job-site footprint, welcome in the territory's smallest municipalities.

Procedures and regulations

Two levels govern construction on this territory. The Antoine-Labelle MRC adopts the regional land-use plan (schéma d'aménagement), which sets broad land designations across the sector; each municipality, for its part, issues building permits and applies its own zoning by-law. Before buying land or signing with a manufacturer, check with the municipality concerned what the target zone allows.

  • The building permit, step by stepPermit procedures for a modular building, from filing the application to the final inspection. View
  • Modular glossaryLand-use plan, zoning, CSA A277, shell finish: the project terms clearly defined. View

Modular builders serving the area

A modular project in the sector does not depend on a local contractor: the building is produced in a factory then moved by road, so most Quebec manufacturers accept deliveries anywhere in the province, including Laurentides. Take the time to compare several offers and validate the RBQ licence.

Partner · Ad

8Module

Modular multi-residential buildings (6 to 24+ units) factory-built in Quebec.

Visit website

Commercial partnership — we may receive compensation. Disclosure

For an overview of the manufacturers active in Quebec, see our modular builders guide.

Frequently asked questions

What role does the Antoine-Labelle MRC play in a construction project?
The permit application is filed with the municipality, never with the MRC. The MRC instead frames the territory through its land-use plan; zoning, setbacks and permit issuance belong to each of the sector's municipalities.
Do you need to target one of the sector's larger municipalities for a modular project?
Nothing forces you to build in a large municipality. Manufacturers deliver everywhere on the Antoine-Labelle territory; what decides feasibility is the target zone's zoning and road access to the lot — two points to validate with the municipality concerned.
Where do the modular homes delivered to the sector come from?
Modules come from factories located all over Quebec and travel by truck to the project's municipality. The right criterion is therefore not how close the factory is, but the quality of the offer: request several detailed proposals and confirm the manufacturer's RBQ licence.