Area · Chaudière-Appalaches

Modular construction in Beauce-Sartigan

A lot — or a project idea — somewhere in the Beauce-Sartigan sector? This area guide covers 16 municipalities, some 56,180 residents in all, the procedures to expect and the modular builders serving the MRC.

Estimate costs

All municipalities in the area

Modular construction serves the entire area, including the following municipalities:

  • Saint-Georges33,895 res. · Georgien, ienne
  • Saint-Côme--Linière3,430 res. · Cômelinois, Cômelinoise
  • Saint-Martin2,688 res. · Martinois, oise
  • Saint-Éphrem-de-Beauce2,580 res. · Éphremois, oise
  • Saint-Gédéon-de-Beauce2,138 res. · Saint-Gédéonois, Gédéonoise
  • Notre-Dame-des-Pins1,934 res. · Notredamois, oise
  • La Guadeloupe1,932 res. · Guadeloupien, ienne
  • Saint-Benoît-Labre1,656 res. · Benois, oise
  • Saint-Honoré-de-Shenley1,610 res. · Shenléen, éenne
  • Courcelles--Saint-Évariste1,295 res. · Gentillé
  • Saint-René1,032 res. · Renéen, enne
  • Saint-Théophile718 res. · Théophilien, ienne
  • Saint-Simon-les-Mines633 res.
  • Saint-Philibert365 res. · Philibertois, oise
  • Lac-Poulin173 res. · Lac-Poulinois, oise
  • Saint-Hilaire-de-Dorset101 res. · Dorsétois, oise

Modular in the Beauce-Sartigan sector

A traditional job site ties up local trades for months; modular flips that logic. Most of the building is completed in a factory, often outside the Beauce-Sartigan sector, before being moved to the project's municipality. On site, only the foundation, assembly and connections remain — a short job-site footprint, welcome in the territory's smallest municipalities.

Procedures and regulations

Don't look for an "MRC permit": in the Beauce-Sartigan sector as everywhere in Quebec, the municipality where the lot sits receives the permit application and applies the zoning. The MRC's role plays out further upstream, through the land-use plan (schéma d'aménagement) that steers the territory's designations. The first concrete step: check with the target municipality what its regulations allow.

  • The building permit, step by stepPermit procedures for a modular building, from filing the application to the final inspection. View
  • Modular glossaryLand-use plan, zoning, CSA A277, shell finish: the project terms clearly defined. View

Modular builders serving the area

A modular project in the sector does not depend on a local contractor: the building is produced in a factory then moved by road, so most Quebec manufacturers accept deliveries anywhere in the province, including Chaudière-Appalaches. Take the time to compare several offers and validate the RBQ licence.

Partner · Ad

8Module

Modular multi-residential buildings (6 to 24+ units) factory-built in Quebec.

Visit website

Commercial partnership — we may receive compensation. Disclosure

For an overview of the manufacturers active in Quebec, see our modular builders guide.

Frequently asked questions

What role does the Beauce-Sartigan MRC play in a construction project?
The permit always comes from the municipality where the lot sits, which also applies its zoning by-law. The MRC acts upstream: its land-use plan (schéma d'aménagement) sets the territory's broad designations. So speak to your municipality's planning department.
Can a modular home be installed in a village of the Beauce-Sartigan sector?
Yes, as long as the target zone's zoning allows it and a municipal permit is issued. The municipality's size is not a barrier: modules arrive by road and assembly requires little local labour. Check the zoning by-law with the municipality before buying the lot.
Does a builder need to be based in the Beauce-Sartigan sector to deliver there?
Modules come from factories located all over Quebec and travel by truck to the project's municipality. The right criterion is therefore not how close the factory is, but the quality of the offer: request several detailed proposals and confirm the manufacturer's RBQ licence.
Advertisement
Ad space

Local builder?

Join our builder network.

Advertise here

For your project

All articles