Coteau-du-Lac at a glance
| Region | Montérégie |
| MRC | Vaudreuil-Soulanges |
| Population | 7,846 |
| Area | 57.06 km² |
| Demonym | Coteaulacois, oise |
| Incorporated | 1982 |
Modular construction in Coteau-du-Lac
In Coteau-du-Lac, as in nearby municipalities (Saint-Lazare, Pincourt), a modular project follows the same path: factory fabrication sheltered from the weather, transport, then assembly on a permanent foundation. Because so much of the work happens before anything reaches the lot, site and weather risks are reduced.
On top of the building price, a project in Coteau-du-Lac carries off-factory costs: the land, the foundation, the connections — water and sewer, or well and septic depending on the sector — and module transport. That total is what you should compare from one builder to the next. On a permanent foundation, the home then finances like any other property.
Read the complete modular home guide · Detailed prices · Choosing a builder
Permits and regulations in Coteau-du-Lac
First things first, the permit: the municipality of Coteau-du-Lac must authorize the project, which remains subject to the Quebec Building Code (RBQ). Zoning sets the permitted setbacks, siting and height. In the factory, fabrication falls under CSA A277 certification; on the lot, the foundation, connections and assembly go through municipal inspection.
Check zoning rules and permit applications directly with the municipality: www.coteau-du-lac.com.
Where to find the rules in Coteau-du-Lac
Rules are specific to Coteau-du-Lac and the target zone. Before buying land or ordering modules, confirm these with the relevant authorities:
- Zoning & planning by-laws — Permitted uses, setbacks, height and siting — and whether factory-built homes are allowed in the target zone in Coteau-du-Lac. www.coteau-du-lac.com →
- Building permit — Application form, required documents and timelines from Coteau-du-Lac's planning department. www.coteau-du-lac.com →
- Regional land-use plan — Regional land-use designations, managed by the Vaudreuil-Soulanges MRC. View →
- Agricultural zone (CPTAQ) — If the lot is in an agricultural zone, Commission authorization may be required before building. www.cptaq.gouv.qc.ca →
- Septic systems & wells — Off municipal services, Regulation Q-2, r.22 governs septic installations. www.environnement.gouv.qc.ca →
- Building code & RBQ licence — Verify your builder's RBQ licence and Quebec Building Code requirements. www.rbq.gouv.qc.ca →
- Guide: building permits in Quebec — Our step-by-step guide to permit procedures for a modular building. View →
- Modular construction glossary — Zoning, minor variance, CSA A277, turnkey… every project term explained simply. View →
- In person — Coteau-du-Lac city hall: 342, chemin du Fleuve.
Modular builders serving Coteau-du-Lac
Modular buildings are factory-built then transported to the site, so a builder does not need to be based in Coteau-du-Lac to deliver a project there. Most Quebec factories serve the entire province, including Montérégie. Always verify the company's RBQ licence and get several quotes.
8Module
Modular multi-residential buildings (6 to 24+ units) factory-built in Quebec.
Visit websiteCommercial partnership — we may receive compensation. Disclosure
To compare manufacturers active in Quebec, see our modular builders guide.
