Les Coteaux at a glance
| Region | Montérégie |
| MRC | Vaudreuil-Soulanges |
| Population | 6,295 |
| Area | 14.5 km² |
| Demonym | Coteaulois, oise |
| Incorporated | 1994 |
Modular construction in Les Coteaux
In Les Coteaux, as in nearby municipalities (Saint-Lazare, Pincourt), a modular project follows the same path: factory fabrication sheltered from the weather, transport, then assembly on a permanent foundation. Because so much of the work happens before anything reaches the lot, site and weather risks are reduced.
On top of the building price, a project in Les Coteaux carries off-factory costs: the land, the foundation, the connections — water and sewer, or well and septic depending on the sector — and module transport. That total is what you should compare from one builder to the next. On a permanent foundation, the home then finances like any other property.
Read the complete modular home guide · Detailed prices · Choosing a builder
Permits and regulations in Les Coteaux
Any construction project in Les Coteaux requires a municipal permit and must comply with the Quebec Building Code (RBQ). Setback, implantation and height rules vary by zoning. Factory production is governed by CSA A277 certification; on-site work (foundation, connections, assembly) remains subject to municipal inspection.
Check zoning rules and permit applications directly with the municipality: www.les-coteaux.qc.ca.
Where to find the rules in Les Coteaux
Rules are specific to Les Coteaux and the target zone. Before buying land or ordering modules, confirm these with the relevant authorities:
- Zoning & planning by-laws — Permitted uses, setbacks, height and siting — and whether factory-built homes are allowed in the target zone in Les Coteaux. www.les-coteaux.qc.ca →
- Building permit — Application form, required documents and timelines from Les Coteaux's planning department. www.les-coteaux.qc.ca →
- Regional land-use plan — Regional land-use designations, managed by the Vaudreuil-Soulanges MRC. View →
- Agricultural zone (CPTAQ) — If the lot is in an agricultural zone, Commission authorization may be required before building. www.cptaq.gouv.qc.ca →
- Septic systems & wells — Off municipal services, Regulation Q-2, r.22 governs septic installations. www.environnement.gouv.qc.ca →
- Building code & RBQ licence — Verify your builder's RBQ licence and Quebec Building Code requirements. www.rbq.gouv.qc.ca →
- Guide: building permits in Quebec — Our step-by-step guide to permit procedures for a modular building. View →
- Modular construction glossary — Zoning, minor variance, CSA A277, turnkey… every project term explained simply. View →
- In person — Les Coteaux city hall: 65, route 338.
Modular builders serving Les Coteaux
Modular buildings are factory-built then transported to the site, so a builder does not need to be based in Les Coteaux to deliver a project there. Most Quebec factories serve the entire province, including Montérégie. Always verify the company's RBQ licence and get several quotes.
8Module
Modular multi-residential buildings (6 to 24+ units) factory-built in Quebec.
Visit websiteCommercial partnership — we may receive compensation. Disclosure
To compare manufacturers active in Quebec, see our modular builders guide.
